100-ton equipment successfully delivered via land-river-sea intermodal transport

Case Background:

Large equipment weighing over 100 tons was successfully loaded onto a ship at the designated dock via a combination of road and barge. Due to the large size and heavy weight of the equipment, the related procedures were quite complex and required a high level of expertise from the personnel. After receiving the cargo information from the client, our team conducted a detailed analysis and professional assessment, providing the client with the best operational plan to ensure the smooth loading and delivery of the equipment.

Basic Information:

Transportation mode: Road + Barge FOB, Dongguan International Container Terminal
POL: DONGGUAN,
POD:TAIWAN
Cargo dimensions: 5914*4975*5021mm 70000KG

Process and difficulties:

After being hoisted and secured at the Foshan factory, the goods were loaded onto hydraulic pallet trucks and transported to the Foshan port.
Challenge: Using two 350-ton truck cranes simultaneously to load ships in Foshan.
Foshan Wharf Barge to Dongguan Humen Wharf
Challenge: Direct loading of a 350-ton floating crane barge onto a large ship.

Factory hoisting

products (2)s5h
products (1)td7

Photos after loading

p (2)oeb
p (1) cry

The process of two 350-ton truck cranes lifting and loading a ship at the barge terminal.

pro (1)7ak
pro (2)lku
for (3)vr9
pro (4)teach
because of (5)
for (6)ai0
pro (7)rlw
for (8)5ce

350-ton floating crane barge direct loading process

pp (1)fde
pp (2)32g
pp (3)ewh
pp (4)6oj
pp (5)kdm
pp (6)izx